The water consumption of the textile ∏¥industry is huge, and theα™ discharge of wastewater is also a lot,←♥ and the amount of t↕βextile sewage is large, th₽₩₽$e content of organic matt>÷εer is high, and the water qua♠≈lity is complex. The PH ≥☆value, CODCr, BOD5, color and so onφ ∞γ in the wastewater are also differ€×☆ent. The treatment method covers a lar÷±♣±ge area, invests a lot, and the φ treatment cost is high,β¥® so that the production cost is hiσ¶πgh. And both anaerobic decolori∑ Ω∏zation method and biological mβ&φembrane method cannot l₹≠"eave the handling of exce↔≥↕×ss sludge, so sludge < a href = "/" > < strong > fold screw type sludge dewateri♣<₩αng machine < / strong > < / a > can play a large role, The separatio™™n and treatment of textileΩδ∏ sewage sludge is solved.
Its processing process:
One is enrichment, after entering σ±"this working procedure, the rotating ax✔>≠is will start to rotate continuou↑®sly, and the water wil& ✘∞l flow out from the si§•γ"de of the stack under the actΩ ion of gravity, so that the pu↕'♦rpose of enrichment can be achieved.
The second is dehydration,✘♦ at this time the sewage has been↔©• concentrated treatment, the rotating s& ☆haft of the spiral sludge dewatering↕₽ machine will promote the concentrate↓α&d sewage, the distance betwee<φn the spiral axes will begin to shrink,÷∞ as the distance of th₹✘e spiral shaft becomes smal✔→¶>ler and smaller, the∑≠✔☆ internal space will also bαλ®egin to shrink, and then the±✔≤₽ sewage will be discharged fro®★≠♠m the device under the action of inte∞♣§λrnal pressure. The dehydration β₩↑★process can be completed thr₽®÷♦ough these working procedures.ε<
The third is the cleaning process, n×≠₹÷ow the spiral sludge d♠©ehydrator is equipped with∏♠£ automatic cleaning function☆β©₹, after the completi≤±on of the above two work steps₩£™£, it will enter the autom✔©atic cleaning procedure, after cleani↔₽©ng treatment can avoid impuriti÷≥←es inside the device and blockage, s÷γ"o the use of spiral eq≠↔↓uipment can reduce the probability ☆>✔of failure, so that the use o♠πγ&f equipment longer.
Performance Advantage:
1, the body design is compact, conce✘•≈ntration and dehydration integra♣∑≤tion, itself with electric control cab®≥↓inet and sludge flocculatiγπ≤ on mixing tank and other a∏→uxiliary devices, strong compaφ÷↓tibility for supporting equipment, ₩↕→easy to design.
2, small design, easy t™Ω™↕o adapt to local conditi&×ons, can reduce the footprint of th"↓σ♦e dehydrator itself and ≈∞$$construction costs.
3, with the sludge enrichment function,↕≈ so there is no need for enrichment an€ ₽★d storage units, reducing th<→e overall floor space and construction≥'" costs of sewage treatment faciλ↕lities.
4, the main body of the dehydrator hπ₹÷ as a self-cleaning fuΩ₹¶Ωnction, so it is not necessa₽ry to prevent sludge blockage and¥& a large amount of water cleaninλ₹g.5, using low speed spiral extrusion tec γ₩hnology, low power cons★↕umption.
6, the electric control cabinet is equβ φ≠ipped with automatic cont÷©♠rol device, from the transp↑★★×ort of sludge, injection of liqui<d medicine, concentration an☆ d dehydration, to discharge mud ™♦♥≥cake, to achieve automatic con•≈βtinuous unmanned operation, re•§duce worker costs.